UHD Video Matrix
UHD Video Matrix
AMS-MT4K_4x4
UHD Video Matrix
4K@60Hz · 4 Input · 4 Output
Splicing · Matrix · Multi-Window
LED Display · LCD Screen
Multi-Screen Manage
High-Performance
Main Chip
Macro Image Technology MDIN 640
The AMS-MT4K series adopts a highly integrated MDIN-640 SoC core architecture, with built-in independent SDRAM and four channel scaling engine, providing stable and powerful 4K ultra high definition image processing capabilities for professional Audio&Visual systems.
Core Algorithm · LTI & CTI Algorithm
Image Enhancement
Engineered for UHD Video matrix processing, these algorithms deliver clearer,
more lifelike visuals with precise detail, sharp edges, and richer contrast.
LTI & CTI Edge Optimization Utilizing Luminance (LTI) and Chrominance (CTI) Transient Improvement algorithms, it intelligently detects and sharpens color transitions. This effectively eliminates edge blurring and color bleeding, resulting in well-defined and distinct object contours.


Functional Advantages
The AMS-MT4K_4x4 features 4 HDMI inputs and 4 HDMI outputs, supporting 4K@60Hz resolutions with up to 18Gbps bandwidth per channel. With full support for HDMI 2.0, HDCP 1.4/2.2, and HDR, it is an all-in-one video controller that allows users to flexibly switch between 3 operating modes: Screen Splicing, Video Matrix, and Multi-Window Display.
High Dynamic Range
Uncompromising Visual Clarity with HDR Technology
The AMS-MT4K Series Video Matrix offers full support for HDR10 and HLG standards and features bidirectional HDR/SDR conversion, guaranteeing seamless compatibility across all legacy SDR and modern HDR display systems.

Web-version upper PC Control
No drivers or software installation required. Simply open any standard web browser for instant matrix routing and video wall management — delivering a streamlined, intuitive, and highly secure operational experience.
Central Control System Integration
Provides a dedicated control protocol to ensure seamless integration with industry-leading control systems such as Crestron, AMX, and Control4 for effortless project deployment.

More Features
Switch Between Input And Output Channels Without Black-Screen Interruptions, Keeping On-Screen Presentations Continuous.
Applications
From Multi-Window Monitoring To Video Walls, Match The Right Display Workflow To Each Space.
More Products
Explore Larger AMS-MT4K Models And The AMS-MTX Range
| Port Specifications | |
| HDMI Input And Output | 4 HDMI-A Inputs And 4 HDMI-A Outputs; HDMI 2.0, Backward Compatible; VESA Standard, Up To 3840 × 2160p@60Hz. |
| NET Ethernet Port | RJ45 Ethernet Port For Web‑Based Control Via A Computer And Ethernet Cable. |
| USB Port | For Device Firmware Upgrades. |
| Audio Input And Output | 4 Analog Audio Inputs And 4 Analog Audio Outputs; 3.5mm Connectors. |
| RS232 Serial Port | Serial Control With Loop‑Out For Cascaded Device Control. |
| ANT | Reserved Extension Interface; Not Enabled. |
| Performance | |
| Switching Method | Seamless Switching With Synchronized Audio And Video Output. |
| Device Language | English; Other Languages Depend On The Ordered Configuration. |
| General Specifications | |
| Power Supply | Built‑In Mean Well Power Supply; 100–240V AC, 50–60Hz. |
| Operating Environment | Working: T: 0°C To +60°C、H: 10% To 90% Relative Humidity, Non‑Condensing; |
| Storage Environment | Storage : T:-40°C ~ +80 °C 、 H: 10% ~ 90%, Non‑condensing; |
| Packing Dimensions | 515 × 345 × 100 mm |
| Gross Weight | 3.5 kg |
| Volumetric Weight | 4.5 kg |
| Warranty | 1 Year; Note: All Rated Voltages Are On Average ±10%; |
| Packing List | |
| Standard Accessories | Power Cable × 1; Certificate × 1; Warranty Card × 1; |
| Model | AMS-MT4K_4x4 |
| Description | Standard Model |




























